Pumpkin Back GIANT Adirondack Chair Project Plan – For A Limited Time
$34.00
Pumpkin Back GIANT Adirondack Chair Project Plan – Digital Download
Description
Limited-Time Offer: GIANT Adirondack Chair Plans with Pumpkin-Shaped Back! 🎃
Get ready to make a bold statement this fall with our exclusive GIANT Adirondack Chair Plans, now featuring a festive pumpkin-shaped back design for a limited time! Standing over 8 feet tall, this show-stopping chair from Island Crown is the ultimate addition to your outdoor space or seasonal display.
What’s Included:
17-page original downloadable PDF plan, fully overhauled with detailed drawings, precise measurements, and step-by-step instructions.
PLUS new 22-page Pumpkin Back design option complete with detailed measurements, step-by-step instructions with coinciding images for each step, material & hardware list, the BEST Customer Support on Etsy and a great, festive design!
NEW Limited-Time Feature: Custom slat designs for a pumpkin-shaped back, perfect for autumn vibes or year-round charm.
Step Plans included as a courtesy for seamless construction.
Complete material & hardware lists to simplify your shopping.
Clear, corresponding images to guide you through every stage of the build.
Whether you’re a DIY newbie or a seasoned builder, these plans give you everything you need to craft a jaw-dropping GIANT Adirondack Chair with a unique pumpkin-inspired twist. Perfect for beachfront porches, cozy coastal backyards, or as a standout piece for tourist attractions, corn mazes and seasonal events!
Please Note:
Full-size paper templates are available as a separate purchase to make your build even easier.
This limited-time pumpkin back design is only available for a short period—don’t miss out! ***Paper Templates DO NOT include items related to the pumpkin shaped back***
Download now and start building your iconic, 8-foot-tall GIANT Adirondack Chair with a festive pumpkin flair today! 🏖️






















